Szczegóły publikacji

Opis bibliograficzny

Computer simulation of the operation of a longwall complex using the “Process Flow” concept of FlexSim software / Marek KĘSEK, Agnieszka ADAMCZYK, Monika KLAŚ // W: Intelligent Systems in Production Engineering and Maintenance : [ISPEM 2018 : Wrocław, 17-18.09.2018] / eds. Anna Burduk [et al.]. — Cham : Springer Nature Switzerland AG, cop. 2019. — (Advances in Intelligent Systems and Computing ; ISSN 2194-5357 ; vol. 835). — ISBN: 978-3-319-97489-7; e-ISBN: 978-3-319-97490-3. — S. 97–106. — Bibliogr. s. 106, Abstr. — Publikacja dostępna online od: 2018-08-01


Autorzy (3)


Słowa kluczowe

modellingcomputer simulationFlexSimlongwall complex

Dane bibliometryczne

ID BaDAP115935
Data dodania do BaDAP2018-09-11
DOI10.1007/978-3-319-97490-3_10
Rok publikacji2019
Typ publikacjimateriały konferencyjne (aut.)
Otwarty dostęptak
WydawcaSpringer
KonferencjaSecond international conference on Intelligent Systems in Production Engineering and Maintenance
Czasopismo/seriaAdvances in Intelligent Systems and Computing

Abstract

The article discusses the essence and legitimacy of computer simulations to plan, monitor and optimize the course of various types of systems, in order to increase their productivity, shorten working time and achieve the desired economic efficiency without having to introduce costly and risky changes in the real process. This paper demonstrates a method of simulation of technological processes, using the example of mining production system realized with longwall complex strategies, using the FlexSim software. The possibility of simulation is presented through two approaches, where the first is based on the standard model structure, while the second is based on new software functionality, which is modeling in the “Process Flow” concept that is particularly useful during the simulation of complex operations. An advantage of the second concept was demonstrated by presenting a faster and more accurate construction process of the aforementioned model. The developed model allows for the exact selection of the best parameters and the estimation of the main indicators characterizing the production process carried out by the longwall complex. Modeling results can be used in the production planning process in mining and at the same time can contribute to maximize its efficiency.

Publikacje, które mogą Cię zainteresować

fragment książki
Process-oriented approach for analysis of sensor data from longwall monitoring system / Edyta BRZYCHCZY, Agnieszka TRZCIONKOWSKA // W: Intelligent Systems in Production Engineering and Maintenance : [ISPEM 2018 : Wrocław, 17-18.09.2018] / eds. Anna Burduk [et al.]. — Cham : Springer Nature Switzerland AG, cop. 2019. — (Advances in Intelligent Systems and Computing ; ISSN 2194-5357 ; vol. 835). — ISBN: 978-3-319-97489-7; e-ISBN: 978-3-319-97490-3. — S. 611–621. — Bibliogr. s. 619–621, Abstr. — Publikacja dostępna online od: 2018-08-01
fragment książki
Probabilistic modeling of mining production in an underground coal mine / Edyta BRZYCHCZY // W: Intelligent Systems in Production Engineering and Maintenance : [ISPEM 2018 : Wrocław, 17-18.09.2018] / eds. Anna Burduk [et al.]. — Cham : Springer Nature Switzerland AG, cop. 2019. — (Advances in Intelligent Systems and Computing ; ISSN 2194-5357 ; vol. 835). — ISBN: 978-3-319-97489-7; e-ISBN: 978-3-319-97490-3. — S. 655–667. — Bibliogr. s. 666–667, Abstr. — Publikacja dostępna online od: 2018-08-01