Szczegóły publikacji
Opis bibliograficzny
Production scheduling for the furnace-casting line system / A. STAWOWY, J. DUDA // Archives of Foundry Engineering / Polish Academy of Sciences. Commission of Foundry Engineering ; ISSN 1897-3310. — Tytuł poprz.: Archiwum Odlewnictwa. — 2013 — vol. 13 iss. 3, s. 84–87. — Bibliogr. s. 87, Abstr.
Autorzy (2)
Słowa kluczowe
Dane bibliometryczne
| ID BaDAP | 74509 |
|---|---|
| Data dodania do BaDAP | 2013-08-07 |
| Rok publikacji | 2013 |
| Typ publikacji | artykuł w czasopiśmie |
| Otwarty dostęp | |
| Czasopismo/seria | Archives of Foundry Engineering |
Abstract
The problem considered in the paper is motivated by production planning in a foundry equipped with the furnace and casting line, which provides a variety of castings in various grades of cast iron/steel for a large number of customers. The quantity of molten metal does not exceed the capacity of the furnace, the load is a particular type of metal from which the products are made in the automatic casting lines. The goal is to create the order of the melted metal loads to prevent delays in delivery of goods to customers. This problem is generally considered as a lot-sizing and scheduling problem. The paper describes two computational intelligence algorithms for simultaneous grouping and scheduling tasks and presents the results achieved by these algorithms for example test problems.