Szczegóły publikacji

Opis bibliograficzny

A multi-objective customer orders assignment and resource leveling in make-to-order manufacturing / Tadeusz SAWIK // International Transactions in Operational Research ; ISSN 0969-6016. — 2007 — vol. 14 iss. 6, s. 491–508. — Bibliogr. s. 508, Abstr. — Publikacja dostępna online od: 2007-10-09. — 17th Triennial Conference of the International Federation of Operational Research Societies : Honolulu, Hawaii, July 11–15, 2005

Autor

Słowa kluczowe

supply chain optimizationmulti-objective integer programmingresource levelingmake-to-order manufacturingcustomer service levelproduction scheduling

Dane bibliometryczne

ID BaDAP35409
Data dodania do BaDAP2007-11-13
Tekst źródłowyURL
DOI10.1111/j.1475-3995.2007.00609.x
Rok publikacji2007
Typ publikacjireferat w czasopiśmie
Otwarty dostęptak
Czasopismo/seriaInternational Transactions in Operational Research

Abstract

This paper presents integer programming formulations and compares two approaches – weighting and lexicographic – to the multi-objective, long-term production scheduling in make-to-order manufacturing, where both maximization of customer service level and best utilization of production resources are integrated in the objective function. The problem objective is to assign customer orders for various product types and with various due dates to planning periods and to select machines for assignment in every period to complete all the orders with minimum numbers of tardy and early orders and with a leveled machine assignment over a planning horizon. The two approaches are applied to optimize long-term production schedules in a flexible flowshop with parallel machines. Numerical examples modeled after a real-world flexible assembly line in the electronics industry are provided and some computational results are reported.

Publikacje, które mogą Cię zainteresować

artykuł
#32639Data dodania: 12.4.2007
A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing / Tadeusz SAWIK // European Journal of Operational Research ; ISSN 0377-2217. — 2007 — vol. 180 iss. 3, s. 1060–1075. — Bibliogr. s. 1075, Abstr. — Publikacja dostępna online od: 2006-07-17
artykuł
#24288Data dodania: 3.11.2005
A multi-objective assignment of customer orders to planning periods in make-to-order manufacturing — Wielokryterialny przydział zleceń do okresów planowania przy produkcji zamawianej / Tadeusz SAWIK // Automatyka : półrocznik Akademii Górniczo-Hutniczej im. Stanisława Staszica w Krakowie ; ISSN 1429-3447. — 2005 — t. 9 z. 1–2, s. 211–222. — Bibliogr. s. 222, Streszcz., Summ. — Artykuł był prezentowany na XVI międzynarodowym sympozjum Zastosowania teorii systemów : Zakopane '2005