Szczegóły publikacji
Opis bibliograficzny
Impact of digitization on key performance indicators of the production process on the example of the AGH LeanLine project / Szymon ZIAJA // W: SGEM 2024 [Dokument elektroniczny] : proceedings of 24th international multidisciplinary Scientific GeoConference : [29th June - 8th July 2024, Albena, Bulgaria]. Vol. 24, iss. 2.1, Geodesy and mine surveying / eds. Oleksandr Trofymchuk, Baiba Rivza. — Wersja do Windows. — Dane tekstowe. — [Sofia] : STEF92 Technology, [2024]. — (International Multidisciplinary Scientific GeoConference SGEM ; ISSN 1314-2704). — e-ISBN: 978-619-7603-69-9. — S. 43–50. — Wymagania systemowe: Adobe Reader. — Tryb dostępu: https://epslibrary.at/sgem_jresearch_publication_view.php?pag... [2025-03-11]. — Bibliogr. s. 50, Abstr. — Dostęp po zalogowaniu. — Afiliacja autora: Akademia Górniczo-Hutnicza
Autor
Słowa kluczowe
Dane bibliometryczne
| ID BaDAP | 158814 |
|---|---|
| Data dodania do BaDAP | 2025-04-14 |
| DOI | 10.5593/sgem2024/2.1/s07.06 |
| Rok publikacji | 2024 |
| Typ publikacji | materiały konferencyjne (aut.) |
| Otwarty dostęp | |
| Czasopismo/seria | International Multidisciplinary Scientific GeoConference SGEM |
Abstract
Digitalization and the concepts of Industry 4.0 undoubtedly contribute to companies' competitive advantage, which can be achieved, among other things, by improving the efficiency and stability of the production process through their implementation. The main purpose of the article is to demonstrate the impact of digitization on the most important indicators of production efficiency using the example of a student project of a production line simulation system, implemented by the Student Scientific Circle of Management. The project concerns the construction of a comprehensive system for teaching Lean Manufacturing methods and tools. The article presents plans for the digitization and autonomization of this project, including the implementation of technologies implementing the concept of Industry 4.0 in the simulation of the production process. It was shown that by digitizing production it is possible to raise the component levels of the OEE process efficiency index and process stability. It was decided to relate the impact of digitization to the real future advantages of implementing new technologies into the project methodology, doing so both numerically and descriptively. The implementation of the new technology, according to the author, will allow to ultimately increase the level of process efficiency (increase the level of the Overall Equipment Effectiveness index) and increase the stability of the production process.