Szczegóły publikacji

Opis bibliograficzny

A new short term electrical load forecasting by type-2 fuzzy neural networks / Man-Wen Tian, Khalid Alattas, Fayez El-Sousy, Abdullah Alanazi, Ardashir Mohammadzadeh, Jafar Tavoosi, Saleh Mobayen, Paweł SKRUCH // Energies [Dokument elektroniczny]. — Czasopismo elektroniczne ; ISSN 1996-1073. — 2022 — vol. 15 iss. 9 art. no. 3034, s. 1–14. — Wymagania systemowe: Adobe Reader. — Bibliogr. s. 13–14, Abstr. — Publikacja dostępna online od: 2022-04-21

Autorzy (8)

  • Tian Man-Wen
  • Alattas Khalid A.
  • El-Sousy Fayez F. M.
  • Alanazi Abdullah
  • Mohammadzadeh Ardashir
  • Tavoosi Jafar
  • Mobayen Saleh
  • AGHSkruch Paweł

Słowa kluczowe

electrical load forecastingtime seriesmachine learningrecurrent fuzzy neural network

Dane bibliometryczne

ID BaDAP140107
Data dodania do BaDAP2022-05-11
Tekst źródłowyURL
DOI10.3390/en15093034
Rok publikacji2022
Typ publikacjiartykuł w czasopiśmie
Otwarty dostęptak
Creative Commons
Czasopismo/seriaEnergies

Abstract

In this study, we present a new approach for load forecasting (LF) using a recurrent fuzzy neural network (RFNN) for Kermanshah City. Imagine if there is a need for electricity in a region in the coming years, we will have to build a power plant or reinforce transmission lines, so this will be resolved if accurate forecasts are made at the right time. Furthermore, suppose that by building distributed generation plants, and predicting future consumption, we can conclude that production will be more than consumption, so we will seek to export energy to other countries and make decisions on this. In this paper, a novel combination of neural networks (NNs) and type-2 fuzzy systems (T2FSs) is used for load forecasting. Adding feedback to the fuzzy neural network can also benefit from past moments. This feedback structure is called a recurrent fuzzy neural network. In this paper, Kermanshah urban electrical load data is used. The simulation results prove the efficiency of this method for forecasting the electrical load. We found that we can accurately predict the electrical load of the city for the next day with 98% accuracy. The accuracy index is the evaluation of mean absolute percentage error (MAPE). The main contributions are: (1) Introducing a new fuzzy neural network. (2) Improving and increasing the accuracy of forecasting using the proposed fuzzy neural network. (3) Taking data from a specific area (Kermanshah City) and forecasting the electrical load for that area. (4) The ability to enter new data without calculations from the beginning.

Publikacje, które mogą Cię zainteresować

artykuł
#169186Data dodania: 31.7.2026
Short-term electrical load forecasting at a 15-minute resolution: a benchmarking study using a rolling-window training approach against official TSO forecasts / Kamil MISIUREK, Tadeusz OLKUSKI, Janusz ZYŚK // Energies [Dokument elektroniczny]. — Czasopismo elektroniczne ; ISSN  1996-1073 . — 2026 — vol. 19 iss. 13 art. no. 3211, s. 1–17. — Wymagania systemowe: Adobe Reader. — Bibliogr. s. 16–17, Abstr. — Publikacja dostępna online od: 2026-07-07
artykuł
#128903Data dodania: 12.6.2020
Towards short term electricity load forecasting using improved Support Vector Machine and Extreme Learning Machine / Waqas Ahmad, Nasir Ayub, Tariq Ali, Muhammad Irfan, Muhammad Awais, Muhammad Shiraz, Adam GŁOWACZ // Energies [Dokument elektroniczny]. — Czasopismo elektroniczne ; ISSN 1996-1073. — 2020 — vol. 13 iss. 11 art. no. 2907, s. 1–17. — Wymagania systemowe: Adobe Reader. — Bibliogr. s. 15–17, Abstr. — Publikacja dostępna online od: 2020-06-05