Szczegóły publikacji

Opis bibliograficzny

Explicit modeling of multi-period setup times in proportional lot-sizing and scheduling problem with variable capacity / Waldemar KACZMARCZYK // Archives of Control Sciences ; ISSN 1230-2384. — 2021 — vol. 31 no. 4, s. 883–912. — Bibliogr. s. 910–912

Autor

Słowa kluczowe

mixed integer programminglot sizing and schedulingproduction

Dane bibliometryczne

ID BaDAP138304
Data dodania do BaDAP2021-12-16
Tekst źródłowyURL
DOI10.24425/acs.2021.139735
Rok publikacji2021
Typ publikacjiartykuł w czasopiśmie
Otwarty dostęptak
Creative Commons
Czasopismo/seriaArchives of Control Sciences

Abstract

Small bucket models with many short fictitious micro-periods ensure high-quality schedules in multi-level systems, i.e., with multiple stages or dependent demand. In such models, setup times longer than a single period are, however, more likely. This paper presents new mixedinteger programming models for the proportional lot-sizing and scheduling problem (PLSP) with setup operations overlapping multiple periods with variable capacity. A new model is proposed that explicitly determines periods overlapped by each setup operation and the time spent on setup execution during each period. The model assumes that most periods have the same length; however, a few of them are shorter, and the time interval determined by two consecutive shorter periods is always longer than a single setup operation. The computational experiments showthat the newmodel requires a significantly smaller computation effort than known models.

Publikacje, które mogą Cię zainteresować

artykuł
#53069Data dodania: 1.9.2010
Modelling multi-period set-up times in the proportional lot-sizing problem / Waldemar KACZMARCZYK // Decision Making in Manufacturing and Services ; ISSN 1896-8325. — 2009 — vol. 3 no. 1–2, s. 15–35. — Bibliogr. s. 34–35, Abstr.
artykuł
#122944Data dodania: 19.7.2019
Valid inequalities for proportional lot-sizing and scheduling problem with fictitious microperiods / Waldemar KACZMARCZYK // International Journal of Production Economics ; ISSN 0925-5273. — 2020 — vol. 219, s. 236–247. — Bibliogr. s. 246–247, Abstr. — Publikacja dostępna online od: 2019-06-10