Szczegóły publikacji
Opis bibliograficzny
Operational tests of a modular installation and transport assembly of steel arch support in underground excavations / Krzysztof KRAUZE, Kamil MUCHA, Tomasz WYDRO, Andrzej Kutnik, Waldemar Hałas, Piotr Ruda // W: Multidisciplinary aspects of production engineering : monograph. Pt. 1, Engineering and technology / ed. Witold Biały. — Warszawa : Sciendo, 2021. — (Multidisciplinary Aspects of Production Engineering ; ISSN 2545-2827 ; vol. 4 iss. 1). — ISBN: 978-83-66675-67-4; e-ISBN: 978-83-66675-68-1. — s. 343-354. — Bibliogr. s. 352-353, Abstr.
Autorzy (6)
- AGHKrauze Krzysztof Bolesław
- AGHMucha Kamil
- AGHWydro Tomasz
- Kutnik Andrzej
- Hałas Waldemar
- Ruda Piotr
Słowa kluczowe
Dane bibliometryczne
| ID BaDAP | 136090 |
|---|---|
| Data dodania do BaDAP | 2021-09-27 |
| Tekst źródłowy | URL |
| DOI | 10.2478/mape-2021-0031 |
| Rok publikacji | 2021 |
| Typ publikacji | fragment książki |
| Otwarty dostęp | |
| Creative Commons | |
| Wydawca | Walter de Gruyter (Sciendo) |
| Czasopismo/seria | Multidisciplinary Aspects of Production Engineering |
Abstract
The roof support, especially the ŁP yielding steel arch support, is transported and assembled in the face with the use of auxiliary machines. This activity in Polish underground mines causes numerous problems, which until present have not been solved. Currently, transport and assembly are carried out manually, while the roadheader and suspended rail are used only to a small extent. Therefore, the modular installation and transport assembly was developed jointly by FAMA Sp. z o. o. and AGH University of Science and Technology. The solution in question enables performing a number of functions (including transport and assembly of all kinds of support arches), which are not available in currently manufactured equipment. The proposed manipulator solves numerous problems occurring during the installation of the steel arch support in an underground mining excavation and significantly improves the process of drilling galleries. This innovative solution considerably differs from the existing ones, and its greatest advantage is versatility with regard to the cross-section and equipment of the roadway, as well as a wide range of functions. In addition, it can also be used for reloading works. The modular installation and transport assembly together with a platform, a temporary mechanized roof support and a mining machine, make up a mechanizes roadheader complex, which enables continuous mining, loading and installing the permanent support in underground workings.