Szczegóły publikacji

Opis bibliograficzny

The impact of shutdowns and equipment failures on the efficiency of the electrotechnical sheet production line : [abstract] / MICHLOWICZ Edward // W: METAL 2019 : 28th international conference on Metallurgy and Materials : May 22nd–24th 2019, Brno, Czech Republic, EU : abstracts. — Ostrava : Tanger Ltd., cop. 2019. — ISBN: 978-80-87294-91-8. — S. 171. — Pełny tekst W: METAL 2019 [Dokument elektroniczny] : 28th international conference on Metallurgy and Materials : May 22nd–24th 2019, Brno, Czech Republic : conference proceedings. — Wersja do Windows. — Dane tekstowe. — Ostrava : TANGER Ltd., cop. 2019. — e-ISBN 978-80-87294-92-5. — ISSN 2694-9296. — S. 1960–1966. — Wymagania systemowe: Adobe Reader. — Tryb dostępu: https://www.confer.cz/metal/2019/972-the-impact-of-shutdowns-and-equipment-failures-on-the-efficiency-of-the-electrotechnical-sheet-production-line [2020-07-02]. — Bibliogr. s. 1966, Abstr.

Autor

Słowa kluczowe

TPM methodsheet productionefficiency

Dane bibliometryczne

ID BaDAP121993
Data dodania do BaDAP2019-06-24
DOI10.37904/metal.2019.972
Rok publikacji2019
Typ publikacjimateriały konferencyjne (aut.)
Otwarty dostęptak

Abstract

One quality that characterizes the management of manufacturing enterprises is the constant search for ways to improve the productivity of production processes. It is production that causes the main stream of materials, components, and parts to flow through individual departments and structures of a company. The task of logistics is to ensure a buyer to obtain the proper quality and quantity of a product in due time and place on the minimal cost of delivery. The use of production lines strongly depends on orders - orders for products. Production is concerned with short throughput times and high schedule reliability in order to on the one hand, fulfill customer demands and on the other hand, increase planning reliability. However, from the business perspective, it is preferred that the available production equipment is highly utilized and that there is the lowest possible WIP (Work in Process level). For the evaluation system used in the study TPM method. The TPM method most commonly employs three indicators: MTTR, MTBF and most typically - OEE. The first two are associated exclusively with technical issues of the examined production line. The object of the study was the production plant of transformer sheets. The article presents parts of research OEE performance indicator for many production lines. In particular, the impact of shutdowns and equipment failures on the sheet production capacity was examined.

Publikacje, które mogą Cię zainteresować

fragment książki
#98482Data dodania: 19.7.2016
Analysis of the impact of downtime on the continuous production of sheets / MICHLOWICZ Edward, ZWOLIŃSKA Bożena // W: Metal 2016 : 25th anniversary international conference on Metallurgy and materials : May 25th–27th 2016, Brno, Czech Republic, Eu : list of abstracts. — Ostrava : TANGER Ltd., cop. 2016. — ISBN: 978-80-87294-66-6. — S. 75. — Pełny tekst na dołączonym CD-ROMie. — S. 1625–1630. — Wymagania systemowe: Adobe Reader ; napęd CD-ROM. — Bibliogr. s. 1630, Abstr. — ISBN 978-80-87294-67-3
fragment książki
#121982Data dodania: 18.6.2019
The use of thermovision for the analysis of sheet deformation / Zoła Kamil, ŻABA Krzysztof, PUCHLERSKA Sandra, BALCERZAK Maciej // W: METAL 2019 : 28th international conference on Metallurgy and Materials : May 22nd–24th 2019, Brno, Czech Republic, EU : abstracts. — Ostrava : Tanger Ltd., cop. 2019. — ISBN: 978-80-87294-91-8. — S. 122