Geomechanical assessments of simultaneous operation in the case of transition from Open Pit to Underground mine in Vietnam / Zbigniew NIEDBALSKI, Phu Minh Vuong Nguyen, Eleonora Widzyk-Capehart // E3S Web of Conferences [Dokument elektroniczny]. — Czasopismo elektroniczne ; ISSN 2267-1242. — 2018 — vol. 35 art. no. 01001, s. 1–8. — Wymagania systemowe: Adobe Reader. — Tryb dostępu: https://www.e3s-conferences.org/articles/e3sconf/pdf/2018/10/... [2018-04-05]. — Bibliogr. s. 8, Abstr. — Publikacja dostępna online od: 2018-03-23. — P. M. V. Nguyen - afiliacja: AMTC, University of Chile. — POL-VIET 2017 : scientific-research cooperation between Vietnam and Poland : Krakow, Poland, November 20–22, 2017
Autorzy (3)
- AGHNiedbalski Zbigniew
- Nguyen Phu Minh Vuong
- Widzyk-Capehart Eleonora
Słowa kluczowe
Dane bibliometryczne
| ID BaDAP | 113173 |
|---|---|
| Data dodania do BaDAP | 2018-04-26 |
| DOI | 10.1051/e3sconf/20183501001 |
| Rok publikacji | 2018 |
| Typ publikacji | referat w czasopiśmie |
| Otwarty dostęp | |
| Creative Commons | |
| Czasopismo/seria | E3S Web of Conferences |
Abstract
Nowadays, for a number of reasons, many open pit mines are considering a transition from Open Pit (OP) to Underground (UG) to remain competitive. In OP-UG transition, UG operation is operated simultaneously with the OP operation for a certain period of time. Guidelines for the simultaneous operation of OP and UG are very difficult to establish, as there are very few case studies available. Yet, because of the OP-UG interactions; the operation has a higher safety, technical and management requirements than the OP or UG methods when considered separately. In Vietnam, Cao Son is one of many OP mines, which decided to change the operational system from OP to UG. Simultaneous operation started in 2015 and will be conducted until 2030 when the OP mine Cao Son ends its mining activities. In this paper, selected geomechanical considerations of the simultaneous operation are presented. A number of numerical modelling calculations using finitedifference software with code FLAC were carried out for calibration process, slope stability analysis and the OP-UG interaction analysis for the Cao Son – Khe Cham II–IV mine. Based on the results obtained from numerical modelling, the geomechanical assessments of simultaneous operation Cao Son – Khe Cham II–IV are discussed in this paper.