Impact of delays during concreting of reinforced high-performance concrete beams / Daniel WAŁACH // Procedia Engineering [Dokument elektroniczny]. — Czasopismo elektroniczne ; ISSN 1877-7058. — 2016 — vol. 161, s. 356–361. — Wymagania systemowe: Adobe Reader. — Bibliogr. s. 361, Abstr. — Publikacja dostępna online od: 2016-10-18. — WMCAUS 2016 : World Multidisciplinary Civil engineering-Architecture-Urban planning Symposium 2016, [Prague, Czech Republic, 13-17 June 2016]

Autor

Słowa kluczowe

construction jointshigh performance concrete

Dane bibliometryczne

ID BaDAP102468
Data dodania do BaDAP2016-12-06
Tekst źródłowyURL
DOI10.1016/j.proeng.2016.08.574
Rok publikacji2016
Typ publikacjireferat w czasopiśmie
Otwarty dostęptak
Creative Commons
Czasopismo/seriaProcedia Engineering

Abstract

Increasing application of HPC commit to analysis its concreting process - the article raises the issue of impact of delays during concreting of reinforced high-performance concrete beams. It is di fficult to cast the whole structure monolithically if the concrete elements are large size; there are some limitations to the availability of formwork, concrete workers or supply of the fresh concrete. In such cases, it becomes necessary to perform structure elements in two or more stages, which leads to formation joints - plane of weakness or discontinuity formed when a batch of concrete hardens before the next batch is placed. Correctly located and properly executed construction joints provide limits for successive concrete placements, without adversely affecting on structure. There is many available guidance as to the location and performance of joints in case of ordinary concretes – some special requirements for HPC have not been found. The main purpose o the research was detailed analysis of the Ultimate Limit State as well as Serviceability Limit State (deflection and cracks) on full-size HPC beams, with different positioning of joints. Both the network of cracks as well as deflection, shaped differently for beams made of HPC in relation to pattern made of ordinary concrete. The obtained results allowed to determine best technology of shaping joints in the beam elements made of HPC, providing obtain an element comparable to the beams which was cast the whole.

Publikacje, które mogą Cię zainteresować

fragment książki
#99805Data dodania: 13.9.2016
Impact of delays during concreting reinforced high-performance concrete beams / Daniel WAŁACH // W: WMCAUS 2016 [Dokument elektroniczny] : World Multidisciplinary Civil engineering – Architecture – Urban planning Symposium : 13–17 June, 2016, Prague, Czech Republic : abstract collection book. — Wersja do Windows. — Dane tekstowe. — [Czech Republic : s. n.], [2016]. — 1 dysk optyczny. — e-ISBN: 978-80-260-9947-5. — S. 16. — Wymagania systemowe: Adobe Reader ; napęd CD-ROM
artykuł
#138842Data dodania: 18.1.2022
Flexural strengthening of reinforced concrete beams using external tendons / Szymon Seręga, Dariusz H. FAUSTMANN // Engineering Structures ; ISSN  0141-0296 . — 2022 — vol. 252 art. no. 113277, s. 1–18. — Bibliogr. s. 17–18, Abstr. — Publikacja dostępna online od: 2021-11-02